PEPSI-DALLAS Facility Renovation

This project included:

  • Infrastructure Power Distribution to Support New Production Line and Corresponding Equipment
  • New Infrastructure Power Upgrade Featuring a 13.8KV Substation with a 2500KVA XFMR and 3000A Switch Gear
  • Adding new RO System along with overhauling existing RO System.
  • New Batching System to support new production Line
  • New heating and cooling for new line and surrounding areas.
  • Power and Controls for new Full Pallet Pick off Spur.